plus Created with Sketch. ! arrow-down arrow-left arrow-right arrow-up Asset 9Asset 7Asset 2 Group 2 Created with Sketch. Rectangle 11 Copy 4 Created with Sketch. Asset 6 close Asset 5 Icon/news/default Asset 20 arrow Created with Sketch. edit Group Created with Sketch. Icon/Learning/Active Icon/Learning/Inactive Shape Asset 10 instagram linkedin Asset 8 Icon/news/default menu send-2 Created with Sketch. Asset 3 pin Asset 14 search share Asset 15Asset 16Asset 19 twitter Asset 11

Resources hub

Categories
Clear

Response to the Modern Manufacturing Strategy consultation - priority area 4: recycling and clean energy

Our submission to the Department of Industry, Science, Energy and Resources

Download

Submission

13 Nov 20

Response to the Inquiry into Waste Management and Recycling of Wind Turbines and Solar PV Panels

Our submission to the Standing Committee on Industry, Innovation, Science and Resources

Download

Submission

6 Nov 20

Response to the integrating energy storage systems into the NEM rule change request

Our submission to the Australian Energy Market Commission

Download

Submission

20 Oct 20

Response to the post-2025 market design consultation paper

Our submission to the Energy Security Board

Download

Submission

19 Oct 20

Response to the second VRET auction consultation paper

Our submission to the Victorian Department of Environment, Land, Water and Planning

Download

Submission

19 Oct 20

Response to the interim report on transmission access reform

Our submission to the Australian Energy Market Commission

Download

Submission

19 Oct 20

Response to the draft grid connection requirements for embedded generation

Our submission Power and Water Corporation

Download

Submission

19 Oct 20

Response to the protecting Australia's critical infrastructure reforms

Our submission to the Department of Home Affairs

Download

Submission

8 Oct 20